I’ve updated the heating system at the Little House in the Village. The previous setup cycled too quickly due to the high heat output from the boiler and the low heat consumption of our small house’s radiators. The boiler needs the high heat output to be able to create hot … Continue reading
Tag Archives: Practice
Workshop Disaster!
The Workshop wiring and plumbing is now complete, having installed all the interior and exterior lighting and installed the unnecessary ‘through the roof’ vent required by the Inspector… In theory[1] the GC has arranged for the Inspector to come on Tuesday to do the Final inspection. He was also supposed … Continue reading