The 3 1/2 tons of Heat Pump equipment arrived today! I probably won’t install right away since, as you can see below, I still have to build the doors for the Workshop loading bay.
The Heat Pumps are LG Mini Split systems. The Workshop gets its own 2 ton unit (21 SEER) and the Office and Finishing rooms each have a 3/4 ton unit coupled to a single compressor (18.9 SEER). I’ll have more when I install these.
Leave a Reply