I’m visiting The Little House in the Village (LHV) for a few days and have made some progress on getting it closer to “Comfortably Liveable”.
Most noteworthy is recommissioning the heating system after its Winter “Break“. Here is the LHV heating system:
Surprisingly, the system started up without a major hitch and I was able to get the Kickspace Heaters in the Bathroom and the Kitchen fully operational. They had been giving me problems when I first installed them, but I suspect this (and other issues) were due to my ‘innovative’ tweaking of one of the boiler’s default parameters (maximum heating temperature). Restoring the default allowed the boiler to operate optimally.
I also discovered, to our relief, that the ‘adventure’[1] we had over the Winter did not leave any damage (other than a few drain holes in the kitchen ceiling).
I also managed to complete the final wiring for the two hallways and front entrance light. It is a welcome sight to see the front porch light when I return from a night in the Village. It is also a relief to be able to turn on the hallway light so I don’t have to stumble around in the dark any more.
Given the success of these early tasks, I then set sight on one of the major conveniences I hoped to enable. I had hoped to install the Bathroom Vanity with a secondary, but possibly more important, goal of moving the temporary Bathroom sink to the Kitchen (so we can do dishes and have water on the first floor). Unfortunately my first efforts in this task were not so successful.
The Vanity is a piece of furniture that I had designed and fabricated in Texas in 2010. We brought the pieces to The LHV in the Fall of 2010 with the idea that I would assemble it and install it on that trip. We managed to get the pieces to the LHV, but ran out of time to assemble it and it has been sitting in the LHV garage since then.
Uh, to say that the LHV garage is humid might be a bit of an understatement. Consequently, as I took the dry fit assembly apart today, I was not too surprised to discover that the floating tenons had swelled to the point that it was extremely difficult to remove the tenons from the pieces. It was very clear that the fit was way too tight to try to glue up the whole assembly. I spent several minutes trying to decide how best to dry out the tenons. My buddy, Jay, was willing to put them on his woodstove or offered to loan me a heat gun. It was in discussing alternatives with Jay that I concluded that putting the tenons in an oven, set to something less than boiling temperature, would dry out the tenons in the most risk free way.
Fortunately, I was able to connect with our great neighbors, Phil and Mary, and they very generously agreed to let me use their oven to ‘cook’ my ‘biscuits’. So we cooked them at 175 degrees for an hour and then, bringing them home (and being too late to try to assemble the Vanity today), I placed them in front of the Kickspace heater, turned up the heat a little, and I’ll let them dry over night. Here’s how they look as they get a nice warm breeze blowing over them…
I sampled a couple of the tenons and it appears that this might work and I might be able to assemble the Vanity tomorrow. I’ll keep you posted…
Notes:
[1] The ‘Adventure’ is a topic for another posting. Suffice it to say that it involved a surprising and unnecessary amount of water under freezing conditions.
Leave a Reply